Add the length of the overhang beyond this mark and.
Framing top plate on a shed style roof.
Position the square at the end of the rafter board with the tongue on your left and facing away from you.
That means after framing add another row of 2 4 or 2 6 on top.
Scatter studs every 16 in.
These hurricane ties came about as a result of the hurricanes causing so much destruction to roof framing members down south particularly in florida.
Double up the top plate of your shed walls to comply with building codes.
Before anything else it s best to understand your materials first to help you identify the best way to support them later on.
Make triangular gusset plates using plywood to attach the 4 pieces to form the truss.
This is the likeliest spot that will see moisture.
To keep the porch roof framing as simple as possible we installed a structural ridge supported by posts at each end with the common rafters landing on top of the ridge.
The product is highly recommended for attaching your roof trusses to the top wall plate.
Nail studs to top plate.
For the length of wall.
Set a ladder at the outside of both corners of the end wall.
Sometimes the rafter will have a tail and extend out past the wall so that you have a soffit or overhang.
Raise it up horizontally and hold it in place with a 2 4 resting on the floor in the center of the base piece and one at the top center of the truss.
You then have rafters running down from this ridge board and resting on the top wall plates.
Portant part of framing.
Use pressure treated lumber for the bottom plate of all shed walls when you build shed on concrete pad.
Detail plates for studs doors windows and intersecting walls.
The xs indicate king studs and double lines indicate cripples.
The rest of the wall can use non pt studs.
A stick framed roof uses 2x4 s or 2x6 s or whatever you are framing with but has a ridge board running down the middle ridge line.
Measure form the top of this line down the board to determine the line length or length of the rafter less the ridge.
A 2 4 or 2 6 or heavier ceiling joist connects the bottom of the truss where it sits on the top plate.
The dimension of the ceiling joist depends on the span and what you plan to store in the attic.
After installing the rafters we still had to extend the porch roof back over the shed roof creating a valley on either side.
Tack top and bottom plates in place.
Carry a gable end in and set it on the top plate upside down and backwards near the end wall.
Framing the roof consists of attaching the trusses to the top plates then nailing the roof sheeting to the trusses.
The simpson strong tie images above were obtained off doing a google search for simpson strong ties.
Pry up top plate.