Guide specification for epoxy terrazzo.
Epoxy resin flooring specifications.
Key quartz chip 100.
Where to find resinous flooring specifications.
Epoxy resin flooring specified under this section is referenced on the drawings as.
Apply one coat two coats of moisture remediation system over concrete surface prepared to receive epoxy resin terrazzo flooring according to manufacturer s written instructions where indicated on drawings.
Sw cartersville ga 30120 770 427 4034 888 restek1 888 737 8351.
Below we explain what all of the above means.
The resin flooring specifications the resin flooring method statements and the resin floor details that we provide have all been developed from our extensive experience gained from many years in the resin flooring business in the uk and overseas.
System shall be 3 16 1 4 inch troweled epoxy.
Specifications and quality of design standard basis of design based on key resin company.
The resin floor should not be overworked but spread slowly and evenly.
Within masterformat specifications for epoxy and other resinous flooring systems can be found in division 9 finishes section 096723 resinous flooring which covers fluid applied monolithic flooring including decorative epoxy and urethane resins in order to make things as easy as possible for architects and contractors at florock we.
Immediately after spreading the floor should be firmly rolled with a spiked roller to help release any.
Resinous flooring specification chemical resistant epoxy.
The above chart is based on coverage for standard 2 1 2 car garage of 500 525 sf.
The following are the most common epoxy guide specifications.
Aci 301 specifications for structural concrete for buildings most recent edition.
Heavy duty three component epoxy resin surfacing broadcasted with colored chips grouted with key 512 chemical and uv resistant epoxy and sealed with key.
The three most important factors when considering an epoxy is the adhesion rating or how strong a bond it makes with your floor second is the abrasion rating or how hard it is to wear off once you are driving a vehicle over it and or working on it third is the.