We are a top epoxy flooring contractors in the phoenix arizona and salt lake city utah.
Epoxy floor life in arizona.
As a general rule epoxy flooring in phoenix az lasts for up to 10 years.
Is one of arizona s largest concrete coating installers.
Arizona epoxy systems llc.
If shortcuts are taken or the process isn t done precisely the floor can bubble chip and scratch off within a short period of time.
Arizona epoxy systems are experts in epoxy flooring and coating for almost any scenario whether it s an auto garage dealership heavy manufacturing plant static sensitive labs or breweries.
We can bring any concrete floor back to life with our restoration and repair services and leave it looking pristine and seamless with one of our top of.
Using advanced polymer chemistry we have formulated a wide variety of high quality products based on epoxy polyurethane and acrylic technology.
Meticulously engineered and formulated by a team with over 35 years of experience in concrete floor coating our products are manufactured in michigan with top notch components so you ll only have to do it once.
We are a leading installer of concrete resinous flooring in phoenix arizona to include.
Founded in 1985 arizona polymer flooring apf manufactures high performance flooring products and concrete coatings systems for contractors architects and end users nationwide.
On average installing floor epoxy in your garage costs between 1 870 and 2 700.
We know that you have many choices when selecting a floor coating but not all coatings yield the same quality of results like epoxy coat.
There is a process with many steps to coating a floor.
Don t let just anyone install your epoxy flooring.
Aes will install your epoxy floor coating quickly so your downtime will be minimized and you can resume operating normally as soon as possible.
Epoxy floors done right will last for many years.
The biggest factor affecting the life of your epoxy floor is the quality of the installation.
If the pro has to repair cracked concrete or clean significant stains the cost will likely be higher.
Epoxy coatings urethane coatings concrete staining concrete sealant installation acid staining quartz flooring vapor and moisture mitigation.